It is the first stage of construction works hen the soil is dozed to the designed height and the constructional trough is prepared. The properly and qualitatively set trough serves as a guarantee of stability and durability of the entire construction. If needed, we reinforce soil by geomashes, remove peat, etc. The subbase is built further only upon having made sure that there is no hazard for stability of the future construction.